Home / Ken Mitchell Reservoir

Installation of all fused HDPE pipelines as listed at various depths and within the lake. This also included a complete control building, pipe, fittings, valves, meters and check valve installation. Also involved value engineering of a basement addition to the control building. In addition to the pipe there were four slide gates ranging in size from 12” to 72” with operators installed at the river intake structure, rip rap and flared end section installed on the lake bottom. Plumbed discharge lines for wet well pumps.

PROJECT DETAILS