Boyd Parallel I

Project Overview

Boyd Parallel Sewer Interceptor Phase I

This project consisted of 2100 feet of 24″ Sewer Collector Main through a heavily populated and high traffic area of Loveland.  Sewer depths ranged from 14′-22′.  The installation required the relocation of waterline and storm sewer infrastructure, along with coordinating the relocation of many other utilities (electric, gas and telecommunications).  Project required extensive public outreach and highly coordinated traffic and pedestrian control.   Project challenges included multiple shoring systems, restricted access and high groundwater conditions.

Project schedule was adjusted to accommodate Phase II traffic control.

Owner:
CITY OF LOVELAND
TANNER RANDALL
970-962-3715