East P8 Waterline

Project Overview

Directional drill 400 LF of 16” FPVC pipe underneath US Hwy 34 and the Farmer Ditch.

Installation of 8” PVC along with valves, hydrants and 2” HDPE service line. 

Connell installed a 16” FPVC waterline under Highway 34.  Set valves and vaults on both sides.  Tied into existing 12” on the north.  Installed 8” east across the field on the south side.  Connell recommended directional drilling the section from the 8” to the east to help mitigate disruptions to the existing gas station, motel, and homeowner.  Businesses remained accessible. Also, slightly modified alignment to eliminate excessive property restoration and offer savings.  

Scope of work was also added to abandon the existing vault and connection.

Owner:
CITY OF LOVELAND
CARLOS MEDINA
970-484-4881