Overland Ponds at Treiber Interconnect

Project Overview

The Project consisted of the connection of existing pond/reservoirs.  The work included constructing two new interconnects and constructing intake and outlet structures at two existing interconnects.  The work included site preparation, installation of construction shafts to access tunnel work, installation of two interconnect pipelines by tunneling methods, construction of intake and outlet structures, gates and reclamation. 

Owner:
TRI DISTRICTS
RICHARD RAINES
970-218-2738